When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
CISCO CCNA CCNP CCIE Collaboration LAB KIT
· The best Cisco collaboration lab kit that covers Cisco Call Manager Express CUCME all topics.
· Practice on both SIP and SCCP phone.
· Pre-configured Call manager Express
· Installed a PVDM for conference and transcoder
· Plug and run.
· Included CME
Lab KIT Includes
· 1 x Cisco 29XX Router version ios Version 15.7
· 512 MB RAM 256 MB flash card
· 1 x PVDM3 – 16
· 1 x Cisco 3750-24 fast ethernet switch POE OR Cisco 2960s-24 POE+ gigabit switch
or
· 1 x Cisco 7941 SCCP phone or Free Upgrade to Cisco 7945 Color Screen
· 1 x Cisco 7962 SIP phone or
· Console Cable
· 2 x Power Cords
· 3 x Straight Cables
· 1 x Serial to USB convertor
Switch#sh env all
FAN is OK
SYSTEM TEMPERATURE is OK
System Temperature Value: 35 Degree Celsius
System Temperature State: GREEN
Yellow Threshold : 66 Degree Celsius
Red Threshold : 76 Degree Celsius
SW PID Serial# Status Sys Pwr PoE Pwr Watts
--- ------------------ ---------- --------------- ------- ------- -----
1 Built-in Good
SW Status RPS Name RPS Serial# RPS Port#
-- ------------- ---------------- ----------- ---------
Switch#sh post
Stored system POST messages:
Switch 1
---------
POST: CPU MIC register Tests : Begin
POST: CPU MIC register Tests : End, Status Passed
POST: PortASIC Memory Tests : Begin
POST: PortASIC Memory Tests : End, Status Passed
POST: CPU MIC interface Loopback Tests : Begin
POST: CPU MIC interface Loopback Tests : End, Status Passed
POST: PortASIC RingLoopback Tests : Begin
POST: PortASIC RingLoopback Tests : End, Status Passed
POST: Inline Power Controller Tests : Begin
POST: Inline Power Controller Tests : End, Status Passed
POST: PortASIC CAM Subsystem Tests : Begin
POST: PortASIC CAM Subsystem Tests : End, Status Passed
POST: PortASIC Stack Port Loopback Tests : Begin
POST: PortASIC Stack Port Loopback Tests : End, Status Passed
POST: PortASIC Port Loopback Tests : Begin
POST: PortASIC Port Loopback Tests : End, Status Passed
Switch#sh power inline
Module Available Used Remaining
(Watts) (Watts) (Watts)
------ --------- -------- ---------
1 370.0 12.6 357.4
Interface Admin Oper Power Device Class Max
(Watts)
--------- ------ ---------- ------- ------------------- ----- ----
Fa1/0/1 auto off 0.0 n/a n/a 15.4
Fa1/0/2 auto off 0.0 n/a n/a 15.4
Fa1/0/3 auto on 6.3 IP Phone 7961 2 15.4
Fa1/0/4 auto off 0.0 n/a n/a 15.4
Fa1/0/5 auto off 0.0 n/a n/a 15.4
Fa1/0/6 auto off 0.0 n/a n/a 15.4
Fa1/0/7 auto off 0.0 n/a n/a 15.4
Fa1/0/8 auto on 6.3 IP Phone 7960 n/a 15.4
Fa1/0/9 auto off 0.0 n/a n/a 15.4
Fa1/0/10 auto off 0.0 n/a n/a 15.4
Fa1/0/11 auto off 0.0 n/a n/a 15.4
Fa1/0/12 auto off 0.0 n/a n/a 15.4
Fa1/0/13 auto off 0.0 n/a n/a 15.4
Fa1/0/14 auto off 0.0 n/a n/a 15.4
Fa1/0/15 auto off 0.0 n/a n/a 15.4
Interface Admin Oper Power Device Class Max
(Watts)
--------- ------ ---------- ------- ------------------- ----- ----
Fa1/0/16 auto off 0.0 n/a n/a 15.4
Fa1/0/17 auto off 0.0 n/a n/a 15.4
Fa1/0/18 auto off 0.0 n/a n/a 15.4
Fa1/0/19 auto off 0.0 n/a n/a 15.4
Fa1/0/20 auto off 0.0 n/a n/a 15.4
Fa1/0/21 auto off 0.0 n/a n/a 15.4
Fa1/0/22 auto off 0.0 n/a n/a 15.4
Fa1/0/23 auto off 0.0 n/a n/a 15.4
Fa1/0/24 auto off 0.0 n/a n/a 15.4
Please contact me if you need more information.